ASTM A192 ASME SA192 High Quality Carbon Boiler and Superheater Seamless Steel Tubes
Size: OD10-168mm X WT1-18mm
Manufacturing Method: Cold Drawn, Hot Rolled.
Application: For manufacturing boiler, reheater, superheater, heat exchanger, condenser, etc.
Boiler Tubes
All power devices operate at high efficiencies required quality steel tubes, to guarantee their safe and long term operation. These Tubes are called as Boiler Tubes
Boiler Tubes are specially manufactured to withstand high pressure and temperature. Boiler tubes are used in energy type equipments like steam pipeline, boilers, super heaters etc.
Boiler Tubes are metal tubes located inside of boilers that heat water in order to produce steam. There are two major types of tube boilers: water-tube boilers and fire-tube boilers.
Boiler tubing is used in these industries:
Steam Boilers
Fossil Fuel Plants
Heat Exchangers
Electric Power Plants
Cogeneration Facilities
Air Preheater Unit
Waste Heat Plants
Power Generation
Economiser etc
ASTM A192/A192M-02 |
Seamless Carbon Steel Bolier Tubes for High-Pressure |
Application: |
For seamless carbon steel bolier and superheater tubes for high-pressure service |
Size(mm): |
O.D.:6.0~114.0 W.T.:1~15 L:max 12000 |
Grade and Chemical Composition (%)
Chemical Composition
|
C |
Mn |
P≤ |
S≤ |
Si≤ |
0.06-0.18 |
0.27-0.63 |
0.035 |
0.035 |
0.25 |
Tolerance(SA-450/SA-450M):
OD In (mm) |
+ |
- |
WT In(mm) |
+ |
- |
<1(25.4) |
0.10 |
0.10 |
≤1.1/2(38.1) |
20% |
0 |
1~1.1/2(25.4~38.1) |
0.15 |
0.15 |
>1.1/2(38.1) |
22% |
0 |
>1.1/2~<2(38.1~50.8) |
0.20 |
0.20 |
|
|
|
2~<2.1/2(50.8~63.5) |
0.25 |
0.25 |
|
|
|
2.1/2~<3(63.5~76.2) |
0.30 |
0.30 |
|
|
|
3~4(76.2~101.6) |
0.38 |
0.38 |
|
|
|
>4~7.1/2(101.6~190.5) |
0.38 |
0.64 |
|
|
|
>7.1/2~9(190.5~228.6) |
0.38 |
1.14 |
Product Image
Manufacture
ASTM A192,ASME SA192 High-Pressure Seamless Boiler And Superheater Tubes are made by the seamless process and shall be either hot-finished or cold-finished, as specified.
Marking
The marking indicate whether the tube is hot finished or cold finished.
Heat Treatment
Hot-finished tubes need not be heat treated. Cold-finished tubes shall be heat treated after the final cold-finishing at a temperature of 1200°F [650°C] or higher.
DATANG STEEL PIPE Co., Ltd is a reputed processor and wholesaler that export to global markets for 17 years.
You will find a extensive range of finned tubes,high quality carbon steel seamless pipe, ERW pipe, SSAW pipe, alloy steel pipe, etc. The pipe fittings and flanges are also available.
Welcome to visit our factory and looking forward to cooperate with you.
FAQ:
1. Q: I haven't done business with you guys before,how can I trust your company?
A: Our company has been in production of steel pipes for 16, almost 17 years, which is longer than most of our fellow suppliers, we've been golden suppliers for years. What's more, we've got quite a lot authority certificates, for example, CE, ISO9001, made in china onsite check certificate. I hope those above will be persuasive enough.
2. Q: What is the minimum order?
A: Yes, our company mainly deals with wholesale deals, but if you insist buying one piece, or you just need one piece, we would be very likely to make the MOQ as 1 piece for you though.
3. Q: How can I get a sample to check your quality? How long can I get the sample?
A: After price confirmed, FREE SAMPLE could be provided for your evaluation.
After you confirm the sample details, the samples will be ready for delivery in 3-7days,and will be sent to you via express and arrive in 3-5days.
4. Q: What payment methods your company accept?
A: We accept T/T, L/C, Western Union, Paypal.
5. Q: What's the shipment terms and delivery time of your company?
A: FOB,CFR,CIF,15-60days
6. Q: Do you give any discount ?
A: We'll surely try our best to help you get those by the best price and good service at the same time.
Contact: Vicky Wu